Who is required to furnish a control diagram and boiler operation instructions?

  1. The manufacturer

  2. The installer

  3. The operator

  4. The inspector

The correct answer is: The installer

The requirement to furnish a control diagram and boiler operation instructions primarily falls on the installer. The installer is responsible for ensuring that the boiler is set up correctly and that all necessary operating procedures and controls are clearly documented and provided. These documents are essential for the safe and efficient operation of the boiler, helping operators understand how to manage the system appropriately. Having a control diagram aids the operator in understanding the interconnections of controls and safety devices, while the boiler operation instructions provide guidance on how to operate the boiler safely. This ensures that the operator can respond effectively to various operational scenarios and maintain safety standards. The installer, being in charge of the installation process, is crucial in creating and supplying this information for proper usage and compliance with regulations.