How many days notice is required for a hydrostatic inspection?

  1. 10 days

  2. 12 days

  3. 15 days

  4. 20 days

The correct answer is: 15 days

A hydrostatic inspection involves pressure testing a boiler to ensure its integrity and safety. According to regulations, a minimum notice period is required to ensure that all parties are prepared for the inspection, which can include scheduling necessary personnel, preparing the site, and ensuring that the boiler is ready. The requirement for a 15-day notice serves several important purposes. It allows adequate time for the notifying party to organize the inspection and ensures that any potential issues or preparations needed for the boiler can be addressed in advance. This notice period is crucial for maintaining safety standards and compliance with the regulations governing boiler operation and inspections. Having a 15-day lead time also gives regulatory agencies an opportunity to plan appropriately and allocate necessary resources to oversee the inspection. Overall, it reflects a commitment to thoroughness and safety in the operation of low-pressure boilers.